ANALYSIS OF RAW MATERIALS DELAY AT PT. XYZ USING THE HOUSE OF RISK (HOR) METHOD
Keywords:
Materials Delay, House of Risk, Aggregate Risk Potential, Effectiveness to DifficultyAbstract
PT. XYZ is one of the companies on Batam Island that fabricates steel construction or modules for the oil and gas industry. However, one of the company's major potential issues is obtaining raw materials in time for fabrication. The purpose of this study is to identify factors causing raw materials delays from the suppliers by determining risk events and risk agents using the House of Risk (HOR) method. The stages for identifying risks and evaluating the risk events and risk agents are performed by interviewing the relevant company staff using questionnaires. The research obtained as many as seven risk events and eleven risk causes, and the study is followed by conducting a correlation assessment process. Finally, producing them to determine the risk agents' ranking. Based on the Aggregate Risk Potential (ARP) of the HOR Model 1, there are three dominant risk agents described by the Pareto Diagram, namely, the Unavailability of the required raw materials (A1), the Changing of materials delivery schedule (A2), and the Negligence of vendors (A5). After obtaining priority order of eight strategies, four strategies resulted in an effectiveness of 80% of the total cumulative Effectiveness to Difficulty (ETD) ratio, namely, improving communication with vendors (PA1), increasing inspection and checking accuracy (PA2), conducting stricter vendor evaluations (PA3), and conducting efficient and economical budget planning and management (PA8).
Downloads
References
A, Odi & S, Hanik & W, Sri & P, Fina. (2024). Risk Measurement and Risk Mitigation Using HOR (House of Risk) in Banana Fruit Processing Industry. Jurnal Teknologi Agro-Industri. 11. 125-139. 10.34128/jtai.v11i2.202.
A, Enas & I, Islam & B, Tahani. (2021). Understanding quantitative and qualitative research methods: A theoretical perspective for young researchers. International Journal of Research. 8. 71-87. 10.2501/ijmr-201-5-070.
Byrd, A.S. & Dessai, Uday. (2025). Risk Assessment.
Cahyani, Z. D., Pribadi, S. R. W., and Baihaqi, I. (2016). Study of Implementation of House of Risk (HOR) Model to Mitigate the Risk of Delays in Imported Materials and Components in New Ship Construction. Jurnal Teknik ITS, 5(2).
C, Vanessa Muñoz Macas, J. Andrés Espinoza Aguirre, R. Arcentales-Carrión and M. Peña, (2021). Inventory management for retail companies: A literature review and current trends. Second International Conference on Information Systems and Software Technologies (ICI2ST), Quito, Ecuador, 2021, pp. 71-78, doi: 10.1109/ICI2ST51859.2021.00018.
H, Aman, A. E. Burhandenny, S. Amasaki, T. Yokogawa & M. Kawahara. (2017). A Health Index of Open-Source Projects Focusing on Pareto Distribution of Developer's Contribution," 2017 8th International Workshop on Empirical Software Engineering in Practice (IWESEP), Tokyo, Japan, 2017, pp. 29-34, doi: 10.1109/IWESEP.2017.14.
H, Hally & R, Muhammad & R, Dedi. (2024). Analysis of Risk Mitigation of Delay in Delivery Using House of Risk Method (Case: Air Cargo Transportation). Journal of Economics, Finance and Management Studies. 07. 10.47191/jefms/v7-i9-54.
I, Nyoman Pujawan and Laudine H. Geraldin. (2009). House of risk: A model for proactive supply chain risk management. Business Process Management Journal. DOI: 10.1108/14637150911003801.
Islamiah, U W, Nurchayanty Tanjung, W, Parwati, N, Tri Purwandari, A, & Mutiasari, M. (2020). Supply Chain Risk Evaluation Information System Design using Fuzzy House of Risk in Wooden Toy Industry. IOP Conference Series: Materials Science and Engineering. Do:10.1088/1757-899X/847/1/012080.
J, Beinschróth. (2022). Implementing an effective qualitative risk analysis. 2022 IEEE 10th Jubilee International Conference on Computational Cybernetics and Cyber-Medical Systems (ICCC), Reykjavík, Iceland, 2022, pp. 000143-000148, doi: 10.1109/ICCC202255925.2022.9922899.
K, Rani & K, Endah & Y, Bambang & W, Tulus. (2025). House of Risk Approach in Determining Delay Risk Factors. IAIC Transactions on Sustainable Digital Innovation (ITSDI). 6. 150-163. 10.34306/itsdi.v6i2.690.
Khamis, N. K., & Abdul Azam, A. M. (2019). Learning Aids of Risk Assessment Apps For Practical Engineering Student: A Case Study. International Journal of Emerging Technologies in Learning (iJET), 14(24), pp. 81–95. https://doi.org/10.3991/ijet.v14i24.11981.
Kifta, D. A. (2021). Analysis of Inventory Control in Relation to Cost Efficiency at PT. Hitek Indo Mulia. Jurnal STIE Galileo. https://www.coursehero.com/file/79406779/.
Kurniawan, S., Marzuky, D., Ryanto, R., & Agustine, V. (2021). Risk and Supply Chain Mitigation Analysis Using House of Risk Method and Analytical Network Process. Journal The Winners, 22(2), 123–136. https://doi.org/10.21512/tw.v22i2.7056.
Liansari, G P and Rajiman, M S and Imran, A and Ramadhan, F. (2020). Risk mitigation in raw material distribution activities using house of risk method in manufacturing. IOP Conference Series: Materials Science and Engineering. Doi.10.1088/1757-899X/830/3/032086.
Lilis Puspitawati, Iqbal Lhutfi, and Inomjon Quadratov, (2024). Enhancing inventory efficiency: the role of Strategic Management Accounting and Integrated Management Accounting Information systems. Taylor and Francis. Article: 2429801. https://doi.org/10.1080/23311975.2024.2429801.
Maharesi, R. (2021). Project Scheduling by Combining PERT and CPM Methods. Proceedings, Komputer dan Sistem Intelijen (KOMMIT 2021).
M, Ulfah, M. S, Sukardi and S, Raharja. (2016). Analysis and Improvement of Refined Sugar Supply Chain Risk Management with House of Risk. Jurnal Teknologi Industri Pertanian. Vol. 26 No. 1.
M, Baraka, J, Claude & Y, Sarma. (2022). Inventory management concepts and implementations: a systematic review. South African Journal of Industrial Engineering. Vol 33, No 2. 15-36. 10.7166/33-2-2527.
N, Ardiansyah, and S. W. Nugroho, (2023). Implementation of the House of Risk (HOR) Method in Supply Chain Risk Management of Seat Track Adjuster 4L45W Products (Case Study: PT XYZ. Industrial Engineering Online Journal, vol. 12, no. 4.
Osei, M.B., Papadopoulos, T., Acquaye, A., Stamati, T. (2023). Improving sustainable supply chain performance through organizational culture: A competing values framework approach, Journal of Purchasing and Supply Management, Volume 29, Issue 2, ISSN 1478-4092, https://doi.org/10.1016/j.pursup.2023.100821.
Q, Aini, D. P. Utami and T. J. Qomariah, (2019). Applying House of Risk Analysis for Supply Chain Risk Mitigation (Case Study)," 2019 7th International Conference on Cyber and IT Service Management (CITSM), Jakarta, Indonesia, pp. 1-4, doi: 10.1109/CITSM47753.2019.8965396.
Ramadhan F.A., Mansur A., Setiawan N., & Salleh, M. R. (2025). An analytical risk mitigation framework for steel fabrication supply chains using fuzzy inference and house of risk, Supply Chain Analytics, Volume 10, ISSN 2949-8635. https://doi.org/10.1016/j.sca.2025.100122.
R, Aswathy & Shaji, Akhila & M, Athul & K, Bhavya. (2025). Smart Inventory Management System. International Journal of Scientific Research in Engineering and Management. 09. 1-9. 10.55041/IJSREM44229.
R, Riska & I, Taufiq & H, Yan. (2025). Supply Chain Risk Management for Waste Management Strategy Using House of Risk Supply Chain Risk Management for Waste Management Strategy Using House of Risk. Jurnal Teknik Industri. 11. 138-147. 10.33506/mt.v11i1.4149.
Sharma, Anita. (2025). Causes and Risk Factors. 10.1201/9781032684819-4.
Slamet. (2025). Implementation of House of Risk (Hor) Model for Mitigating Raw Material Supply Chain Risk at PT. Raja Indonesia Perkasa. JKIE (Journal Knowledge Industrial Engineering). 10. 166-181. 10.35891/jkie.v10i3.6176.
S, Samuel & G, Jonathan. (2025). Risk Factors. 10.4324/9781041057185-3.
Wibowo, D. A. and Ahyudanari, E. (2020). Application of House of Risk (HOR) Models for Risk Mitigation of Procurement in The Balikpapan Samarinda Toll Road Project. IPTEK Journal of Proceedings Series No. (1), ISN (2354-6026). The 1st International Conference on Business and Engineering Management (IConBEM 2020). pp. 172-177.
Winarso, K & Jufriyanto, M. (2020). Rework Reduction and Quality Cost Analysis of Furniture Production Processes Using the House of Risk (HOR). Journal of Physics: Conference Series. IOP Publishing. DO: 10.1088/1742-6596/1569/3/032022.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Decky Antony Kifta, Yunesman (Author)

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

